ADVERTISEMENT

ADVERTISEMENT

Branch With Electricity Substation DWG Block for AutoCAD

BRANCH WITH ELECTRICITY SUBSTATION

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

Control shed, Air, of Earth, Fuses, lighting, For cables, structure, Retained, structure, Kva, tension, Tran, tension, Tran, exists, Rsa, Rsa, Ozalbaichen ranch, Project plan, U.r. Herradura, Mpio. Buctzotz, Federal electricity commission, scale:, flat:, only, Merida, Tizimin, Valladolid, River lizards, Buctzotz, Ranch, progress, Cacalchen, Scale: no scale, Golden Grain, location, Horseshoe, summary:, Line of a.t., Pz pc post, Op. V., Kva pz transformer, cruise, Preparation, drawing:, revised:, Approved, Sta. pink, unscaled, Line, Agro, Executive Project, S.a. Of c.v., Ing. Carlos estrada canedo, regional manager, Regional sub-management of operation, Regional management of the peninsula of yucatan, General sub directorate of operation, National Water Comission, Executive project of the irrigation units dzalbaichen the horseshoe, according:, Deputy manager of operation, Ing. Enrique araiza rodriguez, Mechanical project, Approved, fourth, control of, Engines, measurement, equipment, Rbt, measurement equipment, Of c.f.e., Fourth control, Engines, aisle, Lattice, firm, trench, Ceiling projection, Sajkab floor, Cyclonic type mesh, Ceiling projection, Electrical substation, rush, N.p.t., To ccm, sidewalk, Wall for measuring equipment of c.f.e., plant, Breaststroke, Cable installed in the, Post interior, Reinforced concrete pole supply, Esp. C.f.e., Reinforced concrete pole supply, Esp. C.f.e., Structure supply, Supply of ag, Structure supply, Rsa retention supply, Retention supply rs, Structure supply, Downlight supply measuring equipment, Supply of physical ground system, Three-phase transformer supply, Acsr cable supply, Dry type kva transformer. Hz., Thermomagnetic switch, without box., Pza, P., Pza, P., unity, Cant, Cia. Supplier hz., Fuse cut-out in kv., Distribution transformer, thermomagnetic switch, measurement equipment, Light contact, Lighting, Potential transformer, Magnetic starter, three-phase motor, Lighting board, Current transformer, Metal post for lighting, Dimensions in other than those indicated in another unit, The previous structure should be a shot to avoid, Transmit mechanical stresses the structure of s.e., All luminaires shall be grounded by means of the cable, of Earth., All electrical equipment must have authorization. corresponding, Volts, Ing. Carlos estrada canedo, regional manager, Regional sub-management of operation, Regional management of the peninsula of yucatan, General sub directorate of operation, National Water Comission, Executive project of the irrigation units dzalbaichen the horseshoe, according:, Deputy manager of operation, Ing. Enrique araiza rodriguez, Electrical project, Approved, Plan on

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Block
Category
Additional Screenshots

File Type dwg
Materials Concrete, Other
Measurement Units
Footprint Area
Building Features Car Parking Lot
Tags , , , , , , , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

CAD Drawings

Leave a Reply