Channel Rainwater DWG Block for AutoCAD
Has cuts, design structures reinforced concrete walls floor; slab
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
north, Npt, dyne, mesh, concrete, tube, rack, Red brick, From cms, variable, as required, depth, Record detail, plant, cut, concrete, Take home, cap of, Heavy tabicon, From cms, concrete, minimum, of thickness., Reinforced with, Rods, Wall of, Var. From cms, both senses, Cms both directions, Wall, Heavy tabicon, How much, In corners, Sn., Sn. Diego, Nundiche, The orchards, cabbage., Beyond, Stgo., Lucrecia, Sta., Sn. Sebastian, Sn. Nicolas, cabbage. Adolf, Water, Verjel, jewel, Del carrizal, chapel, Pedro, River, countryside, the, Stama, view, Cuquila, Gpe.hidalgo, beautiful, Sn. Isidro, Nundaco, big, thin, aviation, Tlaxiaco, Benedict, Juarez, plan., Takes, Sto., Orchards, Sn. Isidro, Cuquila, the pines, assumption, Stama, Sta. cross, Francisco madero, Benito Juarez, the sunflowers, the purest, Neighborhood san miguel, Esc prim, Hippodrome prolongation, independence, Morelos, Wilfrido c. angle, Miguel Dzahuindanda, River, Itandeca, Sn., Sn. Diego, Nundiche, The orchards, cabbage., Beyond, Stgo., Lucrecia, Sta., Sn. Sebastian, Sn. Nicolas, cabbage. Adolf, Water, Verjel, jewel, Del carrizal, chapel, Pedro, River, countryside, the, Stama, view, Cuquila, Gpe.hidalgo, beautiful, Sn. Isidro, Nundaco, big, thin, aviation, Tlaxiaco, Benedict, Juarez, plan., Takes, Sto., Orchards, Sn. Isidro, Cuquila, the pines, assumption, Stama, Sta. cross, Street axis, Street hippodrome prolongation, bridge, Independence street, architectural plant, Acot:, Total area of, Ml of paving: m., Total area, Street axis, Street hippodrome prolongation, bridge, Independence street, architectural plant, Acot:, Total area of, Ml of paving: m., Total area, River, bed, river, Street axis, Street hippodrome prolongation, bridge, Independence street, architectural plant, Acot:, Total area of, Ml of paving: m., Total area, River, Concrete of f’c, natural terrain, Compacted soil layer cm thickness, Pend, Crosscut, school, Every meter, Tours, Contour lines, Stretches, mileage, Utm, Coordinates, Horizontal curve not, Bench level, Runoff, Road axis, Symbology, Site of, draft, Lic. Miguel Perez Vasquez., Treasurer, Vo.bo., Lic. Rocio lopez cruz, Municipal syndicate trustee, Vo.bo., Councilor for public works:, Ing. Jesus morales santiago, Responsible for the project:, the mayor, Oaxaca, address, C. Federico pacheco perez, I authorize, Vo.bo., scale, cabbage. center, Dimension, C. A preview of what LinkedIn members have to say about alejandro:, draft, Paving with hydraulic concrete, flat, Meters, date, number, district:, location:, municipality:, region:, cabbage. center., Mixtec, Tlaxiaco, San felipe tindaco, Microlocalization sketches, Street. Hippodrome prolongation, Street hippodrome prolongation, Limited ownership, Concrete of f’c, natural terrain, Compacted ground base cm thickness, Pend, Crosscut, school, Every meter, Tours, Contour lines, Stretches, mileage, Utm, Coordinates, Horizontal curve not, Bench level, Runoff, Road axis, Symbology, Site of, draft, Lic. Miguel Perez Vasquez., Treasurer, Vo.bo., Lic. Rocio lopez cruz, Municipal syndicate trustee, Vo.bo., Councilor for public works:, Ing. Jesus morales santiago, Responsible for the project:, the mayor, Oaxaca, address, C. Federico pacheco perez, I authorize, Vo.bo., scale, cabbage. center, Dimension, C. A preview of what LinkedIn members have to say about alejandro:, draft, Paving with hydraulic concrete, flat, Meters, date, number, district:, location:, municipality:, region:, cabbage. center., Mixtec, Tlaxiaco, San felipe tindaco, Microlocalization sketches, Street. Hippodrome prolongation, Street hippodrome prolongation, Limited ownership, Compacted soil sudbase cm, natural terrain, F’c garnish, Firm concrete, Fc, see detail, Vrs., its T., mesh, elevation, Concrete thickness, mesh, elevation, Concrete thickness, Variable section., Mesh, Overlap min., Cm., Vrs., its T., variable., Encino, Jacarandas, Francisco i. log, Isabel la catholic, pending, Jacarandas, Concrete fitting, Armex de, Concrete f’c, concrete, Take home, cap of, Heavy tabicon, From cms, Record detail, plant, cut, concrete, minimum, of thickness., Reinforced with, Rods, Wall of, Var. From cms, both senses, Cms both directions, Wall, Heavy tabicon, How much, In corners, Sn., Sn. Diego, Nundiche, The orchards, cabbage., Beyond, Stgo., Lucrecia, Sta., Sn. Sebastian, Sn. Nicolas, cabbage. Adolf, Water, Verjel, jewel, Del carrizal, chapel, Pedro, River, countryside, the, Stama, view, Cuquila, Gpe.hidalgo, beautiful, Sn. Isidro, Nundaco, big, thin, aviation, Tlaxiaco, Benedict, Juarez, plan., Takes, Sto., Orchards, Sn. Isidro, Cuquila, the pines, assumption, Stama, Sta. cross, Site of, draft, San felipe tindaco, Cross section, material
Raw text data extracted from CAD file:
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
north, Npt, dyne, mesh, concrete, tube, rack, Red brick, From cms, variable, as required, depth, Record detail, plant, cut, concrete, Take home, cap of, Heavy tabicon, From cms, concrete, minimum, of thickness., Reinforced with, Rods, Wall of, Var. From cms, both senses, Cms both directions, Wall, Heavy tabicon, How much, In corners, Sn., Sn. Diego, Nundiche, The orchards, cabbage., Beyond, Stgo., Lucrecia, Sta., Sn. Sebastian, Sn. Nicolas, cabbage. Adolf, Water, Verjel, jewel, Del carrizal, chapel, Pedro, River, countryside, the, Stama, view, Cuquila, Gpe.hidalgo, beautiful, Sn. Isidro, Nundaco, big, thin, aviation, Tlaxiaco, Benedict, Juarez, plan., Takes, Sto., Orchards, Sn. Isidro, Cuquila, the pines, assumption, Stama, Sta. cross, Francisco madero, Benito Juarez, the sunflowers, the purest, Neighborhood san miguel, Esc prim, Hippodrome prolongation, independence, Morelos, Wilfrido c. angle, Miguel Dzahuindanda, River, Itandeca, Sn., Sn. Diego, Nundiche, The orchards, cabbage., Beyond, Stgo., Lucrecia, Sta., Sn. Sebastian, Sn. Nicolas, cabbage. Adolf, Water, Verjel, jewel, Del carrizal, chapel, Pedro, River, countryside, the, Stama, view, Cuquila, Gpe.hidalgo, beautiful, Sn. Isidro, Nundaco, big, thin, aviation, Tlaxiaco, Benedict, Juarez, plan., Takes, Sto., Orchards, Sn. Isidro, Cuquila, the pines, assumption, Stama, Sta. cross, Street axis, Street hippodrome prolongation, bridge, Independence street, architectural plant, Acot:, Total area of, Ml of paving: m., Total area, Street axis, Street hippodrome prolongation, bridge, Independence street, architectural plant, Acot:, Total area of, Ml of paving: m., Total area, River, bed, river, Street axis, Street hippodrome prolongation, bridge, Independence street, architectural plant, Acot:, Total area of, Ml of paving: m., Total area, River, Concrete of f’c, natural terrain, Compacted soil layer cm thickness, Pend, Crosscut, school, Every meter, Tours, Contour lines, Stretches, mileage, Utm, Coordinates, Horizontal curve not, Bench level, Runoff, Road axis, Symbology, Site of, draft, Lic. Miguel perez vasquez, Treasurer, Vo.bo., Lic. Rocio lopez cruz, Municipal syndicate trustee, Vo.bo., Councilor for public works:, Ing. Jesus morales santiago, Responsible for the project:, the mayor, Oaxaca, address, C. Federico pacheco perez, I authorize, Vo.bo., scale, cabbage. center, Dimension, C. A preview of what LinkedIn members have to say about alejandro:, draft, Paving with hydraulic concrete, flat, Meters, date, number, district:, location:, municipality:, region:, cabbage. center., Mixtec, Tlaxiaco, San felipe tindaco, Microlocalization sketches, Street. Hippodrome prolongation, Street hippodrome prolongation, Limited ownership, Concrete of f’c, natural terrain, Compacted ground base cm thickness, Pend, Crosscut, school, Every meter, Tours, Contour lines, Stretches, mileage, Utm, Coordinates, Horizontal curve not, Bench level, Runoff, Road axis, Symbology, Site of, draft, Lic. Miguel perez vasquez, Treasurer, Vo.bo., Lic. Rocio lopez cruz, Municipal syndicate trustee, Vo.bo., Councilor for public works:, Ing. Jesus morales santiago, Responsible for the project:, the mayor, Oaxaca, address, C. Federico pacheco perez, I authorize, Vo.bo., scale, cabbage. center, Dimension, C. A preview of what LinkedIn members have to say about alejandro:, draft, Paving with hydraulic concrete, flat, Meters, date, number, district:, location:, municipality:, region:, cabbage. center., Mixtec, Tlaxiaco, San felipe tindaco, Microlocalization sketches, Street. Hippodrome prolongation, Street hippodrome prolongation, Limited ownership, Compacted soil sudbase cm, natural terrain, F’c garnish, Firm concrete, Fc, see detail, Vrs., its T., mesh, elevation, Concrete thickness, mesh, elevation, Concrete thickness, Variable section., Mesh, Overlap min., Cm., Vrs., its T., variable., Encino, Jacarandas, Francisco i. log, Isabel la catholic, pending, Jacarandas, Concrete fitting, Armex de, Concrete f’c, concrete, Take home, cap of, Heavy tabicon, From cms, Record detail, plant, cut, concrete, minimum, of thickness., Reinforced with, Rods, Wall of, Var. From cms, both senses, Cms both directions, Wall, Heavy tabicon, How much, In corners, Sn., Sn. Diego, Nundiche, The orchards, cabbage., Beyond, Stgo., Lucrecia, Sta., Sn. Sebastian, Sn. Nicolas, cabbage. Adolf, Water, Verjel, jewel, Del carrizal, chapel, Pedro, River, countryside, the, Stama, view, Cuquila, Gpe.hidalgo, beautiful, Sn. Isidro, Nundaco, big, thin, aviation, Tlaxiaco, Benedict, Juarez, plan., Takes, Sto., Orchards, Sn. Isidro, Cuquila, the pines, assumption, Stama, Sta. cross, Site of, draft, San felipe tindaco, Cross section, material
Raw text data extracted from CAD file:
Language | Spanish |
Drawing Type | Block |
Category | Water Sewage & Electricity Infrastructure |
Additional Screenshots | |
File Type | dwg |
Materials | Concrete, Other |
Measurement Units | |
Footprint Area | |
Building Features | Car Parking Lot |
Tags | autocad, block, channel, concrete, cuts, Design, DWG, floor, kläranlage, rainwater, reinforced, slab, structures, treatment plant, walls |