Crossing Via Gas Line DWG Block for AutoCAD
RAILWAY CROSSING ROADS OF GAS LINE 4 BY DRIVING PLG DIAMETER PIPE
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
Via ffcc orizaba veracruz, binder, Piv, binder, Garrison, Boundary, sidewalk, Garrison, binder, gas, binder, gas, binder, gas, via, via, Boundary, Tubonah, post, binder, Garrison, sidewalk, Garrison, binder, Garrison, sidewalk, gas, post, tree, Reg, Reg., Existing gas line, Project gas line, Cedula api gr, localization map, Transport secretary, Rail sector, Center sct veracruz, applicant:, scale, do not. Plan, Cordova, Mexico, Site of the work, Quantities of pipe, concept., unity., quantity., Tracks of ff. DC., Soil mechanics survey., Introduce a hollow shaft auger into the corresponding ground, The steel tubes should be cleaned using the method of, Apply a primer of coal tar in two layers of mils., Of in. Each mechanically protecting with felt mesh, In. Finish with a catalyzed high solids epoxy, Applying an epoxy primer to a layer of, All anti-corrosion coating thicknesses are considered in, Sand grading metal coating, Before enabling the pit as indicated by the following, Push the pipe when it is to be inserted, Extraction of the auger if the ground, Once completed the above build one that will have, To capture the terrain extracted from the, As a primary function of allowing to weld the pipe sections, The additions shall be provided according to the characteristic conditions, The piping that is introduced as the first section should, Length width to accommodate both pushing beams, The length of pipe being of this length, Of the pipe by providing at least one slope of the, Level of the ground to the level of driving. To agree with the contractor, Perform an excavation at the point where the end, By hydraulic jacks, This method can be used as a complement to the above good, Be protected at its initial end as indicated by detail, In two layers of mils. Of in. each., For good maneuverability., Of fiberglass., Interior coating, Dry layer, Outer coating, Mind as follows, Corrosion protection, Of the adjacent land to contain., Extracts., method, only., Dimensions except those indicated in another unit., The cutting of the shirt will be done according to the manufacturer of them., For welding electrodes of the series, The preparation of all field welds of, Should be made as specified in the, Indicated in the case of which the length, Your length will be, The method of driving will be that indicated with approval of the, Conditions prevailing at the time, Residence of the national railways of mexico taking in, To avoid instability of the ground before later settlements, In the area of the pipeline by any of the, Of the a.w.s. Welding, To protect the pipe when it should be, Make a plug on the job site to cover the tip of the pipeline., by, Following methods, Of the execution., Construction procedure, To the right of way of the f.f.c.c., Test standard penetration s.p.t., Elevations in meters., Live load considered cooper, Via ffcc sc km, Via ffcc orizaba veracruz, Via ffcc, Motorway mexico cordoba, Right of way ffcc, Crosses the junction., Fiber optic telmex, Reg., Starts crossover o., localization map, Transport secretary, Center sct veracruz, applicant:, scale, Site of the work, amounts of work., concept., unity., quantity., Introduce a hollow shaft auger into the corresponding ground, The steel tubes should be cleaned using the method of, Apply a primer of coal tar in two layers of mils., Of in. Each mechanically protecting with felt mesh, In. Finish with a catalyzed high solids epoxy, Applying an epoxy primer to a layer of, All anti-corrosion coating thicknesses are considered in, Sand grading metal coating, Before enabling the pit as indicated by the following, Push the pipe when it is to be inserted, Extraction of the auger if the ground, Once completed the above build one that will have, To capture the terrain extracted from the, As a primary function of allowing to weld the pipe sections, The additions shall be provided according to the characteristic conditions, The piping that is introduced as the first section should, Length width to accommodate both pushing beams, The length of pipe being of this length, Of the pipe by providing at least one slope of the, Level of the ground to the level of driving. To agree with the contractor
Raw text data extracted from CAD file:
Language | Spanish |
Drawing Type | Block |
Category | Water Sewage & Electricity Infrastructure |
Additional Screenshots | |
File Type | dwg |
Materials | Glass, Steel, Other |
Measurement Units | |
Footprint Area | |
Building Features | Car Parking Lot |
Tags | autocad, block, crossing, diameter, digester, driving, DWG, fuel, gas, griffin, kläranlage, line, pipe, pipeline, railway, roads, tank, treatment plant |