ADVERTISEMENT

ADVERTISEMENT

Detail Installation Of Bio Digestor DWG Detail for AutoCAD

Detail installationof bio-digestor for treatment black waters

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

top, Water inlet, Sludge extraction valve, Treated water outlet for garden irrigation, Fill with the material of the excavation tamper, At the base of the excavation must be made a template cm thick, Note: It is important to add cement in weight ratio. To fill the excavation. The addition of ground cement will be made gradually until the logging height of sludge, The excavation must be done leaving a slope that does not allow the landslide of the earth, Fill with cement material water, top, Water inlet, Access for cleaning clearing, Sludge extraction valve, top, Waste entrance, treated water, Mud log, Sludges, Fat creams, Cm., filter, plant, cut, Outlet of treated water, Detail of biodigestor fosaplas, The pit should be centered having a free space around cm, Dig a space of cm

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Detail
Category
Additional Screenshots
File Type dwg
Materials
Measurement Units
Footprint Area
Building Features Garden / Park
Tags , , , , , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT