Detail Switch And Transformer Camera DWG Detail for AutoCAD

ADVERTISEMENT

ADVERTISEMENT

or

Details in base for transformer CFE

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

installation., Use: support pedestal type transformer, For water levels, the arrangement of the, Of the carcamo polyduct sleeves will be built, When the structure is located on a sidewalk,, When the structure is located in stream will use frame cap, All the terminals of the pipelines in the registers shall contain a, Finished polishing with polished concrete avoiding sharp edges, Copper deposits drowned in the walls of the, All the interconnections will be with autogenous welding., In case of having reduced dimensions in bench the registration is, Face one side of the disconnector base., Underground distribution., As shown in the drawing., Of fused faith b., Of fused faith a., So as not to damage the cable insulation., Dosed in accordance with the manufacturer’s instructions., Dimensions in centimeters except where another unit is indicated., High strength fy steel will be used, F’c concrete with mm petro aggregate, All the concrete used must carry impermissible integral, Invariably in each stage of casting should be used vibrator., Minimum coating of cm cm in foundation shoes., Notes construction specifications, The overlaps of rods will be of a length of diameter, Will increase by more than one-third of the, Any shape without exception shall be made to finish, Before moving the structure on the floor of the excavation must, Be properly compacted a concrete template will be installed, Fillings of all excavations should be compacted into layers of, Thickness with material from the excavation to which it is, Anchors must be placed round iron galv. for, Of the two located on each opposite side which, Contains the terminals at the top, Bottom of the duct bank cm of the cloth of the last bed of, The gauge of the copper wire shall be equal to the neutral run in the, All sharp edges should be rounded to give them a finish, To obtain optimum moisture in order to achieve the optimum, Reinforcement of the section., Without flattening, Maximum degree of compaction., ducts., With chamfer of mm without flattening, Poor with a minimum thickness of cm., Sugun required, Is required, Is required, Concrete base for transformer, Sugun required, Vars Cm, Both directions, ground, natural, Polished finish, Champaign, Cap ring, Pend., Vars Cm, Carcamo, see note, Pend., Both directions, Vars Cm, Polyamide sleeve for, Ground rod cw., See note no., Elevation refuerso secc., Esc .:, Elevation refuerso secc., Sugun required, Vars Cm, Both directions, Vars Cm, natural, ground, Both directions, Vars Cm, Esc .:, Carcamo, see note, Pend., Polished finish, Champaign, Cap ring, Pend., Above the featico level., The entrance should be, High level case, Vars Cm, Both directions, Cap ring, of length., Canes, Base projection of disconnectors, Deck slab reinforcement, Esc .:, Vars Cm, Drowned, The cable will be, The land network, See note no., Ground rod cw., Polyamide sleeve for, naked. See notes, Secc.refuerzo en fences, Esc .:, Pend., Welding detail, Welding cm, side, view, Esc., frontal, view, The cable will be, Drowned, The land network, naked. See notes, Base plant for disconnector, Esc.

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Detail
Category
Additional Screenshots
File Type dwg
Materials Concrete, Steel, Other
Measurement Units
Footprint Area
Building Features Deck / Patio, Car Parking Lot
Tags , , , , , , , , , , , , , , , , , , , , , , , , , ,
or

Share Your Valuable Opinions

Cart (0)

  • Your cart is empty.