Electrical Installation Cultural Center DWG Full Project for AutoCAD
Electrical Project Cultural Center; includes plants shines and sockets; details and pictures of detailed circuit loads.
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
modifications, sec, project lighting installation of cultural center victoria, August, sheet of, street: riquelme, commune: curanilahue, esc .:, owner: i. municipality of curanilahue, population: sector center, r. legal: luis gengnagel gutierrez, nelson orlando valencia monsalves lic. s.e .:, cent., total, lighting load box, t.d.a., cto. no, ench., others, kw., pot., phase, dif., disy, protections, Location, duct, canalization, t.p.r.e., total, t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., flur., focus s, t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., focus, led, focus, focus, presen, sensor, extrac., embu. aluro, focus, guitar room battery, music Workshop, control room, workshop, foyer, dance studio, for sale, outdoor access, guitar battery room circulation, music workshop sockets, control room, visual arts workshop, foyer, dance studio, for sale, meeting room, address information, meeting room, address, available, t.p.r.e., visual arts workshop, dance studio, waiting room, meeting room cultural management, available, cent., total, lighting load box, t.d.a., cto. no, ench., others, kw., pot., phase, dif., disy, protections, Location, duct, canalization, t.p.r.e., total, t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., flur., t.p.r.e., t.p.r.e., t.p.r.e., focus, led, focus, focus, focus emb., presen, sensor, extrac., aluro, focus, and load load, tramoya, circulation, men’s dressing rooms, women, personal sector s. mechanical engineer manager, motion tramoya, men’s dressing rooms, dresses ladies circulation, personal area, technical director, t.p.r.e., room machines, t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., available, t.p.r.e., t.p.r.e., t.p.r.e., focus s, available, t.p.r.e., t.p.r.e., room machines, available, cent., total, lighting load box, t.d.a., cto. no, ench., others, kw., pot., phase, dif., disy, protections, Location, duct, canalization, t.p.r.e., total, t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., focus, t.p.r.e., t.p.r.e., t.p.r.e., focus, led, focus, focus, focus emb., presen, sensor, signal., aluro, focus, seating, t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., focus s, seating, steps, seating, equipment plug, t.p.r.e., t.p.r.e., t.p.r.e., seating, steps, posterior partition, technical booth, available, cent., total, lighting load box, t.d.a., cto. no, ench., others, kw., pot., phase, dif., disy, protections, Location, duct, canalization, t.p.r.e., total, t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., fluo., t.p.r.e., t.p.r.e., focus, led, focus, focus, focus emb., presen, sensor, extrac., aluro, focus, women cellar bathrooms, bathroom changer for the handicapped, men, circulation, patio the kilos, available, available, t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., t.p.r.e., focus s, circulation, women, patio the kilos, available, cent., total, lighting load box, t.d.a., cto. no, ench., others, kw., pot., phase, dif., disy, protections, Location, duct, canalization
Raw text data extracted from CAD file:
Language | Spanish |
Drawing Type | Full Project |
Category | Mechanical, Electrical & Plumbing (MEP) |
Additional Screenshots | |
File Type | dwg |
Materials | Other |
Measurement Units | |
Footprint Area | |
Building Features | Deck / Patio, Car Parking Lot |
Tags | autocad, center, cultural, details, DWG, éclairage électrique, electric lighting, electrical, electricity, elektrische beleuchtung, elektrizität, full, iluminação elétrica, includes, installation, lichtplanung, lighting project, pictures, plants, Project, projet d'éclairage, projeto de ilumina, sockets |