Elevators DWG Detail for AutoCAD
DETAILS ELEVATORS
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
Vertical section, note, Of doors., of the, Wall build, Slab boring plant, Door light, Cad generated drawing, Minimum isolation of airborne dba in, Horizontal vertical construction elements which, Make up the room according to the, Basic rule of the building, door, Plataf., Under lintel, C. Maq. minimum, Of hollow hd, Hollow hw, doors, viewed, Interlocking, Hollow hw, viewed, doors, Of machines minimum, minimum, Of machines minimum, granite, Green oil, blue Night, rubber, Black circles rubber, granite, coffee, lignite, Interior cabin, Light doors, Front seen, Cw cabin, Deliver cw, Hollow width hw, Cd cabinet, Hd hollow depth, Entrerrail, minimum, Minimum machine room, Right, Left, All doors must have the same sense of opening., Mark a cross in the box corresponding to the chosen layout., Door arrangement, thickness, Slab mm., Drill dimensions, Light mm., Hollow width hw, Deliver cw, Cw cabin, Front seen, Light doors, Hd hollow depth, Cd cabinet, Flush, Interlocking, Detail of doors light mm., Plant room of machines, Hollow plant, pavement, Hollow according, To the regulation, last access, Door light, Height under lintel, Height of hollow, travel, Straps, Limits of employment:, Customer service supplies jobs, hole, fourth, Machines, Various, Hollow dimensions, Dimensions of maximum gap, Maximum access, Maximum travel, Placement of machinery above the gap, A smooth gap with minor collisions according to the rules of, Lifting devices with permanent on top, Surface area of the hollow transverse., A watertight pit capable of supporting the loads indicated in this drawing., The necessary girders in the gap for the anchorage of the fastening of the guides, Of counterweight cabin., The received auction of the doors of his portis. detail, A quarter of well-lit lux well ventilated, To evacuate due to the equipment in addition to the heat without exceeding, Of indoor temperature. Equipped with a metal door with lock., The concreting of the for the according to the measures of this, Plane capable of withstanding loads if that of the machine, Are more than about the rest of the room’s surface, Must provide for a detachable, Access ladder, A metal hatch on the floor of the room with hooks on the roof, Located above the mechanism flap for a load of kp, The first kp the second., The force rush in the room with his, Fuses its connection under tube to the switchgear., Both under the discharge regulations for one, Fall from below to below as indicated below., An earth connection carried to the elevator pit in accordance with the regulations, Of low, Be provided to the neutral of the, From the start of the assembly the necessary current for the tools, Working the lift set-up tests., The provisional protections in the accesses to the gap during the assembly period., A closed room suitable for the elements of the lift from, His arrival work., All work not included in this contract., All doors go n the same hand, minimum, O.p., Bench, with, Diverter, For doors of o.p. Mm. Subtract mm. The quota, Recommended cab cw cd mm., Recommended dimensions depending on the gap, Max., To the regulation, Hollow according, pavement, Light mm., Limits of employment:, Customer service supplies jobs, hole, fourth, Machines, Various, Hollow dimensions, Dimensions of maximum gap, Maximum access, Maximum travel, Placement of machinery above the gap, A smooth gap with minor collisions according to the rules of, Lifting devices with permanent on top, Surface area of the hollow transverse., A watertight pit capable of supporting the loads indicated in this drawing., The necessary girders in the gap for the anchorage of the fastening of the guides, Of counterweight cabin., The received auction of the doors of his portis. detail, A quarter of well-lit lux well ventilated, To evacuate due to the equipment in addition to the heat without exceeding, Of indoor temperature. Equipped with a metal door with lock., The concreting of the for the according to the measures of this, Plane capable of withstanding loads if that of the machine, Are more than about the rest of the room’s surface, Must provide for a detachable, Access ladder, A metal hatch on the floor of the room with hooks on the roof, Located above the mechanism flap for a load of kp, The first kp the second., The force rush in the room with his, Fuses its connection under tube to the switchgear., Both under the discharge regulations for one
Raw text data extracted from CAD file:
Language | Spanish |
Drawing Type | Detail |
Category | Mechanical, Electrical & Plumbing (MEP) |
Additional Screenshots | |
File Type | dwg |
Materials | |
Measurement Units | |
Footprint Area | |
Building Features | Elevator, Car Parking Lot |
Tags | ascenseur, aufzug, autocad, DETAIL, details, DWG, einrichtungen, elevador, elevator, ELEVATORS, facilities, gas, gesundheit, l'approvisionnement en eau, la sant, le gaz, machine room, maquinas, maschinenrauminstallations, provision, wasser bestimmung, water |