Help on GoFundMe

ADVERTISEMENT

ADVERTISEMENT

Executive Project Of Line Conduction By Graveness DWG Full Project for AutoCAD

Executive project of line conduction by graveness – Plant – Details – Profile

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

Spring no., Bn. Tank, Ent. Existing tank, Tank on, Non-existent tank, Bn., Bn., Bench level, Target point, Indicated, July, flat:, Executive project of gravitational pumping line, Dr. Francisco torres mogollan, date:, scale:, the mayor, Ing. Francisco sanchez perez, key:, Public Works, San Felipe, gentleman, Santa Cruz, Moxolahuac, Guadeloupe, The dahlias, Cuauhtémoc, San Juan, crowned, Juarez, San matias, Tlalancaleca, Santa Rita, Talhuapan, San Rafael, Ixtapaluca, the green, San Salvador, Blowjob, They taste good, San Martin, Moyotzingo, Santa Maria, Chiautzingo, San Lorenzo, San Felipe, Teacupingo, San Agustin, Atzompa, Tlaltenco, San antonio, Nepopualco, Sands, Sunday, Huejotzingo, Apizaco, Tlaxcala, Chiautempan, Zacatelco, Tlaltenango, San Miguel, Xoxo, San Lorenzo, Almecatla, Mihuacan, Chiautzingo, Santa Maria, Coronango, San Juan, Cuautlancingo, the Union, San Francisco, Elevations of, Level spot, The elevations of the system are referred to the level bank no. With elevation located of the km on a tree. The volumes of template inserts are in function of the sections regulated by the c.n.a. The hydrostatic test of the pipe will be according to the following criteria: times the workload. Times the working capacity of the pipe. The maximum test length shall be m. For purposes of the hydraulic test the pipeline shall be left uncovered on a length of either side of the test section. The location of the purges of the defogues is so they should be located in the field precisely at the lowest points of the profile respectively. In all tees elbows must be constructed of concrete concrete of f’c whose dimensions must be according to diameter. The location of the reinforced concrete berths are so they should be located in the field precisely in the points where they are required. The details of docks for the pipeline are in the collecting plane collector. The detail of crossing of the river is in the plane of collector berths., Notes, tank, Guadeloupe, Saragossa, Electric power pole, path, Powerline, Driving line plant, Esc:, Driving line profile, Esc: horz, elevation, ground, natural, station, River, Texal spring on, Elev., Texal spring on, Elev., Proposed site for collection box, Pumping truck for reinforced concrete cap., Site proposed for regularization tank cap .:, Regularization tank, Existing cap .:, Proposed site for carcamo km, Crossing with steel mm, Crossing with fo. Go. Mm, River, living place, Proposed site, For tank, Regularization, Fo. Go., crossing, Mm high-density polyethylene pipe, P.v.c. pipe Mm length English series, Air expulsion, Disengages of mm, Mm pipe, admission valve, P.v.c. pipe English series of steel mm at crossroads, P.v.c. pipe Mm series of mm, Normal piezometric line of work, L.p., L.p., L.p., Line by water hammer, Normal piezometric line of work, L.p., L.p., Mm of, amounts of work, Dump filler, concept, excavation, masonry, Contact cusp, quantity, M.l., concrete, concrete, reinforcing steel, flabby., Cruises special pieces., Box type ii, P.v.c, Box type ii, P.v.c., Fo. Go., P.v.c., venting, Box type ii, P.v.c., Mm steel, P.v.c. from, Intercommunication of tanks, Km to, Stretch by pumping km to, Stretch by gravity km, Normal piezometric line of work, Quota, Piezometric, load, Coefficient of time variation, Chlorination, Regularization, treatment, Total length of the line, Hab, Hab., Lp, Project data, endowment, Daily maximum expenditure, Maximum hourly expenditure, current population, Project population, Average annual expenditure, Coefficient of daily variation, Hours of pumping, Driving expense, Hrs., Lp, Regularization proposed, Pumping frame, Mm fire pipe, M.l., river, Carbon steel pipe of mm, channel of, M.l., Tube of p.v.c. English series of …, Mm of, M.l., Mm of, M.l., High density polyethylene tube, Mm of, M.l., template, compacted fill, template, Thickness of, compacted fill, Dump filler, Trench construction section, template, Inches, nominal diameter, depth, width, excavation, volume of, Rel. Of special pieces., concept, Coupling of fo.go. Of, Board gibault de de, Nipple of fo.go. Cm, Tee of fofo Of, Air inlet valve, Balloon valve, Hydrotome of p.v.c. Of diameter, Elbow of p.v.c. from …, Km to, Gate valve of fo.fo. Of, Simbol., P., P., P., unity, Cant, Tee of fofo Of, P., Of, With exit from, Of, P., Of, P., Of, P., Adapter for p.v.c. Bell of, P., P., Adapter for p.v.c. Ear of corn, Tip of p.v.c. Spike

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Full Project
Category
Additional Screenshots
File Type dwg
Materials Concrete, Masonry, Steel
Measurement Units
Footprint Area
Building Features Car Parking Lot
Tags , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

CAD Drawings

Leave a Reply

ADVERTISEMENT