Industrial Warehouse Complex Site Plan with sewage System Layout

ADVERTISEMENT

ADVERTISEMENT

or

Comprehensive site plan for a ‘Condomínio de Galpões’ (Warehouse Complex) located in Loteamento Jardim Jambeiro, Quadra 58, Camaçari. The plan features 27 warehouses (galpões) of varying dimensions, ranging from 144m² to 540m², arranged in rows with central circulation streets.

Key Infrastructure Elements:
– Complete sewage system layout with 100mm and 150mm diameter pipes
– Anaerobic filter and septic tanks designed for 150 people
– Sumidouro (cesspool/drainage field) connections
– Administrative building (425m²) with adjacent parking (18 spaces)
– Additional parking areas (12 and 28 spaces) strategically distributed
– Central avenue with transversal access roads
– Perimeter green areas and gardens
– Site access point from the Monte Gordo road

The drawing includes elevation data points, contour lines, and drainage slopes (1% to 4%). The scale is 1:500 with cross-sections (T01-T03, L01-L03) showing road profiles and access points. Property boundary demarcation and technical specifications for wastewater management comply with local engineering standards.

Language Portuguese
Drawing Type Plan
Category
Additional Screenshots
File Type dwg
Materials
Measurement Units Metric
Footprint Area Over 5000 m² (53819.5 ft²)
Building Features Parking, Garden / Park
Tags , , , , , ,
or
ADVERTISEMENT

Release Information

  • Price
    :

    $5.00

  • Categories
    :
  • Released
    :

    May 14, 2025

Share Your Valuable Opinions

Cart (0)

  • Your cart is empty.