ADVERTISEMENT

ADVERTISEMENT

Media Tension Electrical Substation DWG Detail for AutoCAD

DETAILS OF ELECTRIC SUB STATION TYPE PEDESTAL POLE WITH TRANSFORMER.

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

Sword type terminal, Integrated in the transformer, Transformer wall, Bronze screw, Mm diameter, Mm long, sleeve, Thermosetting, Aluminum cable, Xlp insulation, Secondary record, detail, see detail, low voltage, medium voltage, indicator, Of failure, Bronze bar for, Earth connection, Of the transition, To the measuring equipment, see detail, Supply in medium voltage are measured in low, With contracted demand for kw substation, Cfe, Street, Of materials user charge connector compression type with copper stirrup aluminum wire soft insulator pin connector for energized line bare copper wire no. Awg. Cross section of tubular profile zinc oxide arresters zinc fuse circuit breaker fuse terminal for power cable power cable galvanized pipe of minimum diameter mm concrete pole mts stainless steel strap ground rod connector ground rod for transient medium voltage recording Should be on the stool. Clamp pin plated galvanized boot thermocontractable cap iron rim cast for recording medium voltage base for transformer mm. Pedestal transformer niche to accommodate current transformers with mm flange mm. Niche to house the base meter gauge cabinet for test tab with flange base bench plug with test board integrated gates for aluminum foil single leaf each. Cable cu awg for downpipe ground of measuring equipment pipe conduit thick wall conduit pipe mm minimum. Charge of the company demand meter power factor pole test board with lid kv current transformer plastic seal type padlock control cable shielded, Important notes the pipe for the rush in m.t. Must go without mutating thermo-drainage boot for the water in the registry the meter should be located to the limit of property to be housed in a concrete niche. The current transformers must be housed in a mm concrete niche next to the meters installing padlock type plastic seal the arresters will be installed in the transition pole will be according to the supply voltage in all the deflections of the power cable must Use wiring log backup configuration configuration of the It is the responsibility of the user subject approval the height of the wall will be defined by the height of the transformer the earth resistance must not be greater ohm the downstream cable of the meter base the earth rod must be caliber cu awg minimum the signal of the system neutral It should not land on the base., Compartment doors that house, Meter test board, detail, load, Without dimensions in mm

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Detail
Category
Additional Screenshots
File Type dwg
Materials Aluminum, Concrete, Plastic, Steel
Measurement Units
Footprint Area
Building Features Car Parking Lot
Tags , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

CAD Drawings

Leave a Reply