ADVERTISEMENT

ADVERTISEMENT

Pad Mountings For Pedistal Transformers 75-500kva DWG Detail for AutoCAD

Details and specification of CFE for pad – mounting base BT3FRMTB4 for pedistal transformers 75 to 500kVA

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

Base plant disconnector, The location of the registry will depend, water table, Elevation reinforcement section, me., Polished cement finish, Detail of planing in planes, water table, Elevation reinforcement section, Cap ring, me., Cfe record, Pend., To install ground wire., Mm polyduct sleeve, note, note:, Of the user’s need, Cap ring, Private record, me., Section reinforcement in walls, Cap ring, Plant cover, Cap ring, Pend., me., Cfe record, Polished cement finish, Cap ring, The armature will be checked in place, Distribution rules construction underground lines, On bench, Base for disconnector registers, Normal ground, In all the terminals of the ducts the living edges must be eliminated, Drilling of ducts with letters of cm of minimum height, On either side of the well without interfering with the, For marine environment salty soils should be used cement type, Of series name of the marks must be low relief, Wells should be identified by the type of date, In case the wells are must be inspected by the lapem, Of manufacture first month number two, During its construction count on its corresponding proof notice., They are going out in, To house power cables in distribution networks, tolerance, Through the, two directions., use:, According to the norm nom, rule, Leaf section, The fillers will adhere to the present specification with degree, All the concrete vibrated to achieve its uniformity, The reinforcing steel will be f and kpa, All concrete f’c, All edges will be chamfered mm., The concrete will have finished apparent in the interior common in the exterior, Cast concrete template of poor cm. Of thickness in case of being, For cable lugs on each side opposite the bank of ducts cm above it., All the concrete will be made with metered integral waterproofing, For water levels the ground rods must be left out, All interconnections of land systems should be, By inserting the copper cable through the polyduct sleeve, When the water level is installed the earth rod in the carcamo, The copper wire of the ground system must be of cross-section of, The quality of the materials shall be checked by a laboratory authorized by, The overlaps of rod will be in accordance with the current regulation, Anchors of round steel galvanized mm, Private record, me., Self-casting welding, Awg, According to the product recommendations, Compaction test proctor., The coatings will be cm, Cast on site, Cap ring, Construction specifications, Dimensions in centimeters, Lifting, Pend., Finished floor level, Cap ring, of Earth., To install cable, Mm polyduct, Transformer base plant, Elevation reinforcement section, Polished cement finish, Champaign, Finished floor level, Cap ring, Elevation reinforcement section, Polished finish with cement, Open carcamo, see note, Low level bass case, note, Cap ring, Finished floor level, All the armed, me., Armex, Detail cast iron hoop, Cap ring, plant, me., All the armed, me., All the armed, Transformers, Kva., Three-phase, note, Carcamo, Case level high, note, Sealed carcamo, Detail of planing in planes, The quality of the materials shall be checked by a laboratory authorized by, During its construction count on its corresponding proof notice., Of manufacture first month number two, In case the wells are must be inspected by the lapem, Wells must be identified by the type of date, Of series name of the marks must be low relief, For marine environment salty soils should be used cement type, On either side of the well without interfering with the, Drilling of ducts with letters of cm of minimum height, In all the terminals of the ducts the living edges must be eliminated, Through the, According to the norm nom, The armature will be checked in place, Anchors of round steel galvanized mm, The overlaps of rod will be in accordance with the current regulation, The copper wire of the ground system must be of cross-section of, When the water level is installed the earth rod in the carcamo, By inserting the copper cable through the polyduct sleeve, All interconnections of land systems should be, For water levels the ground rods must be left out, All the concrete will be made with metered integral waterproofing, For cable lugs on each side opposite the bank of ducts cm above it., Cast concrete template of poor cm. Of thickness in case of being, The concrete will have finished apparent in the interior common in the exterior, the R

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Detail
Category
Additional Screenshots
File Type dwg
Materials Concrete, Steel
Measurement Units
Footprint Area
Building Features A/C, Car Parking Lot
Tags , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

CAD Drawings

Leave a Reply