Protection Net DWG Block for AutoCAD
Protection net half tension – Nicaragua
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
Loyal villa, Managua, Tplx, Mts wire guarantor, General notes, Disurge, Date of reception of work:, Network adaptation, Management data, Construction data, Address: east side of loyola institute, utilization:, designer:, Builds, scale:, reviewed:, Dissent, date of service:, Tplx, Acsr, first name:, owner:, Date of execution:, Date of approval:, Dissent, Sheet no., drawing:, date:, March, draft, Mts:, Type: air, by:, Existing transformer., frame, Transformer install, Junction box, Existing concrete pole, Existing pine post, Concrete post install, Existing fuse, Existing secondary line, Secondary line install, Existing single-phase primary line, Existing trifasic primary line, Retained install, It would relocate traph of which is sub used in an associate illegal supplies according to design needs of the work., Lmt, Lbt, Derivations to the client supported in bonds, Gral in alignment, Of derivation, Empty lot, search, Empty lot, search, Empty lot, legalize, Kva, Mcm, Mts, Kva, Ct kva kva, Kva, Cplx, Cplx mts, Tplx, Tplx mts, Cplx, Acsr mts, Cplx, Mcm, legalize, Kva, Punk hair gel, Mcm, legalize, Three-phase, legalize, The taxi’s corner, The corner of the answers, Three-phase plast, chopped up, legalize, legalize, legalize, Closed cellar, legalize, Three-phase, Cent non-existent meter number, legalize, legalize, not visible, legalize, Imtech non-existent meter number, Swallow coins, legalize, Kva, Relocate trava kva, Hose house, Cond acsr mts, Pub, legalize, Acsr guarantor, Acsr, Awg, Acsr, Awg, Acsr, Awg, Acsr, General notes, Disurge, Date of reception of work:, Network adaptation, Management data, Construction data, Direction: north side hose market, utilization:, designer:, Builds, scale:, reviewed:, date of service:, Tplx, Acsr, Name: network adaptation lamt labt., owner:, Date of execution:, Date of approval:, Sheet no., drawing:, date:, draft, Mts:, Type: air, by:, Existing transformer., frame, Transformer install, Junction box, Existing concrete pole, Existing pine post, Concrete post install, Existing fuse, Existing secondary line, Secondary line install, Cable installer, Existing trifasic primary line, Retained install, Trifasic primary line install, Project: network adaptation. ” Lost. ” Network install, Acsr, Work detail 3-phase three-phase lamphase bank acsr de lamt single-phase acsr. Lampholder single-phase lampholt in normalized cross-section of labt on end of crossbars, junction boxes to provide service cable tie to support the connections. Single-phase motor protection protected from kva in cplx removed from installation of predominantly commercial type. All users connected directly. Measured on public roads in racks on uf poles., Pto, exists, install, remove, observations, Remove trafos, Black concrete, Simp circ trif ancl. Ang. Disp hor awg, Simp circ trif fin line disp hor acsr, Ground up concrete pole, Dan, Black concrete, Simp Circ trif alin ang disp hor acsr awg, Simp circ trif fin line acsr, Trafo installation, Bt end of line, Three-phase, Bt, Bt end of line, of security, Pat cuba trafo, Flatten post, Bt end of line, Of spaces, Three-phase bypass, Bt end of line, Black concrete, Bt, Mt bt, Dan, Install in crosshead, Ground up concrete pole, Mm., Of spaces, of security, Black concrete, Mt bt, Bt end of line, Install in crosshead, Dan, Mm., Of spaces, Three-phase bypass, of security, Kva, Tx:, Bt end of line, Three-phase bypass, post, Simple circ. End of line single phase, Bt end of line, Mt bt, Of spaces, Install in crosshead, Three-phase bypass, Mm., of security, Simple circ. End of line single phase, Bt, Monof. Self-protected kva, Of spaces, Three-phase bypass, of security, Mt bt, Bt end of line, Install in crosshead, Three-phase bypass, Mm., Of spaces, of security, The work consists of the adaptation of lamt networks in the sector of the north side of the market sector house of which will be retired three-phase transformers bank in the configuration will install three-phase bank for less exposure to electric fraud in the area. In addition, a self-protected transformer will be installed for customers associated with the west sector of the hose house., Detail of the measure, Junction point to, Towards the mts steer, Medium-line three-way airliner
Raw text data extracted from CAD file:
Language | Spanish |
Drawing Type | Block |
Category | Water Sewage & Electricity Infrastructure |
Additional Screenshots | |
File Type | dwg |
Materials | Concrete |
Measurement Units | |
Footprint Area | |
Building Features | Car Parking Lot |
Tags | alta tensão, autocad, beleuchtung, block, détails électriques, detalhes elétrica, DWG, electrical details, elektrische details, haute tension, high tension, hochspannung, iluminação, kläranlage, l'éclairage, la tour, lighting, net, nicaragua, protection, tension, torre, tower, treatment plant, turm |