ADVERTISEMENT

ADVERTISEMENT

Reservoir Geomembrane DWG Block for AutoCAD

PLANNING A RESERVOIR WITH GEOMEMBRANA 2000 M3

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

cut, Esc., cut, Esc., cut, Esc., plant, Esc., plant, Esc., cut, Esc., cut, Esc., plant, Esc., cut, cut, Protection grid, Suction basket, steel, Polypropylene ref. Mm, Butterfly valve, Reservoir crown, Geomembrane anchor, Reservoir crown, Geomembrane anchor, cut, Polypropylene ref. Mm, Butterfly valve, cut, cut, natural terrain, No puny stones, cut, Concrete channel, Intake channel, Reservoir crown, Geomembrane anchor, Reservoir crown, Geomembrane anchor, Geomembrane reservoir, Useful volume, Pvc pipe, Intake manifold, Overflow pipe, Intake manifold, Polypropylene ref. Mm, Butterfly valve, Polypropylene ref. Mm, Butterfly valve, Valve box, legend, Flange with bushing mm, Polypropylene butterfly valve ref. Mm, Elbow pvc mm, Pvc sap pipe mm., Union of repair mm, Tee pvc sap. Mm, Flange with bushing mm, Polypropylene butterfly valve ref. Mm, Pvc sap pipe mm., Metal cap m., Union of repair mm, Polypropylene butterfly valve ref. Mm, Flange with bushing mm, Pvc sap pipe mm., compacted fill, Vent tub, Pvc., Vent tub, Pvc., For the lining of the inlet channel, concrete with a coating thickness of the typical section will be used. The cement used will be type the concrete overflow of the canal will be in the will be disposed in form as indicated in the corresponding typical section. The concrete surface finish will be type according to technical specifications., Earth movements, concrete, Technical specifications, For the coating of the reservoir will be used pvc geomembrane with protective geotextile coating thickness of your facility will be staffed by highly qualified personnel in this type of work. The welding between pvc geomembrane will be done by means of chemical welding through an integral solvent which is elaborated with the dissolved polymer., Geomembrane, Before beginning the earthworks for the outline of the area of ​​improvement for the profile of installation of pipeline of entry channel must be carried out the topographical survey of the area of ​​the reservoir of the axis of the channel whose plane must be approved by the supervisor. The filler material shall be placed in horizontal layers of compacted thickness no greater than compaction shall be carried out when the material exhibits adequate moisture up to a density of not less than the maximum density obtained by the modified standard proctor method. The size of the overlays will be on both margins of the channel, the cut fill slope being due to the fact that the existing material has this natural slope., Valve box, legend, Flange with bushing mm, Polypropylene butterfly valve ref. Mm, Elbow pvc mm, Pvc sap pipe mm., Union of repair mm, Tee pvc sap. Mm, Flange with bushing mm, Polypropylene butterfly valve ref. Mm, Pvc sap pipe mm., Metal cap m., Union of repair mm, Polypropylene butterfly valve ref. Mm, Flange with bushing mm, Pvc sap pipe mm., compacted fill, Vent tub, Pvc., Vent tub, Pvc., For the lining of the inlet channel, concrete with a coating thickness of the typical section will be used. The cement used will be type the concrete overflow of the canal will be in the will be disposed in form as indicated in the corresponding typical section. The concrete surface finish will be type according to technical specifications., Earth movements, concrete, Technical specifications, For the coating of the reservoir will be used pvc geomembrane with protective geotextile coating thickness of your facility will be staffed by highly qualified personnel in this type of work. The welding between pvc geomembrane will be done by means of chemical welding through an integral solvent which is elaborated with the dissolved polymer., Geomembrane, Before beginning the earthworks for the outline of the area of ​​improvement for the profile of installation of pipeline of entry channel must be carried out the topographical survey of the area of ​​the reservoir of the axis of the channel whose plane must be approved by the supervisor. The filler material shall be placed in horizontal layers of compacted thickness no greater than compaction shall be carried out when the material exhibits adequate moisture up to a density of not less than the maximum density obtained by the modified standard proctor method. The size of the overlays will be on both margins of the channel, the cut fill slope being due to the fact that the existing material has this natural slope., Detail channel, admission, Metal cap, Valve box, Compacted earthworks, Compacted filler anchor, Compacted earthworks, Compacted filler anchor, Terrapl

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Block
Category
Additional Screenshots
File Type dwg
Materials Concrete, Steel
Measurement Units
Footprint Area
Building Features Car Parking Lot
Tags , , , , , , , , , , , ,

ADVERTISEMENT

CAD Drawings

Leave a Reply

ADVERTISEMENT