Screener Chamber DWG Block for AutoCAD
SCREENER CHAMBER FOR PURE WATERS AND REDUCE ENVIRONMENTAL POLLUTION
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
relationship, Plant camara sieve, scale, cut, scale, dimensions, Pvc, Inner face, Outer face, By section, unscaled, Isometric detail, Steps, Fc, Holes to incorporate, Rope, The cap with crane., Handle to facilitate, Manually the location of the lid, At the time of removal with the crane, Must be kept clean, Rod of, Details lifting hooks, Cm vertically horizontal direction, Plant cover camera sieve, scale, dimensions, Pvc, Jaboque wetland level, Cm vertically horizontal direction, Pvc, Sieve camera, scale, dimensions, Entrance wall, Sieve camera, scale, dimensions, Exit wall, Sika pvc tape similar, Total volume of concrete, Total reinforcing steel, Total length reinforcement, figure, Table of work quantities, quantity, Long, Grid details, quantity, unity, Kg., Manual excavation common ground, Fill type ii receive, Poor concrete base, Psi concrete, reinforcing steel, item, Quantities of materials, Kg., Typical inspection well, reinforcing steel, Typical inspection well, Withdrawal of leftovers, Cover plate hoop, Tape for construction joints, rules:, Concrete following the recommendations of the, Colombian code of seismic design of bridges., Standard structural design criteria, code, chapter, Live cargo truck design, The location of the screening chamber will be made relative to the axis., In the upper boundary it would be adjusted with the slope of the track., The first digit of the code of each rod corresponds to the diameter, Dimensions in meters except where another unit is indicated, Excavation needs to be adjusted, In eighth of the remaining length in decimetres., Docking pipes cleaning., The coating of the rods will be cm., Concrete with resistance days of:, The pipes to be partially embedded in, Concrete must be cleaned prior to concrete casting., Waterproofed integral camera., Which must be guaranteed for the construction thereof:, Main geotechnical soil parameters for the chambers., reinforcing steel, Study of floors: ing alfonso uribe s., Net capacity, Specific weight filled, The access covers will be those specified by the company., Mils layers should be applied. Each of primer, Epoxy red sika for the protection of the grid, The following ladder for your application, Recommendations., Iron to be cut on site, Plant cover camera sieve, scale, reinforcement, Pvc, Sieve camera, scale, cut, reinforcement, Construction gasket, see detail, Construction gasket, see detail, Construction gasket, see detail, Construction gasket, see detail, Concrete cleaning cms, Sieve camera, scale, reinforcement, Entrance wall, Sieve camera, scale, reinforcement, Exit wall, Inner face, Outer face, Cm vertically horizontal direction, By section, Playground stage stages, location, scale:, aqueduct:, modifications, firm, modification, Name ing. responsable, date, Design plan for storm drainage networks, location, Contains, Direction sewer water service, file name:, Date: January of, draft, Plan no., Indicated, Park screen engativa.dwg, Sieve chamber, Notes, aqueduct:, Msnm, review, Ing. Alfonso Rojas Bazurto, M.p., C.c .: xx, designer, Dr. Xx, legal representative, Average coordinates, griddle, Mooring point, Igac, north:, East:, aqueduct:, review, controller:, Ing. Xx, Registration no. Xx, He received:, revised:, M.p. do not.:, Approved:, Contract number xx, Registration no .: xx, Ing. Xx, M.p. do not.:, Ing. Xx, Playground stage stages, location, scale:, aqueduct:, modifications, firm, modification, Name ing. responsable, date, Design plan for storm drainage networks, location, Contains, Direction sewer water service, file name:, Date: January of, draft, Plan no., Indicated, Park screen engativa.dwg, Sieve chamber, Notes, aqueduct:, Msnm, review, Ing. Alfonso Rojas Bazurto, M.p., designer, legal representative, Average coordinates, griddle, Mooring point, Igac, north:, East:, aqueduct:, review, controller:, Ing. Xx, Registration no. Xx, He received:, revised:, M.p. do not.:, Approved:, Contract number xx, Registration no .: xx, Ing. Xx, M.p. do not.:, Ing. Xx, Paramen, Paramen, via, Sardinel, Sardinel, via, via, Reach, via, via, Sardinel, Sardinel, Postlu, Paramen, Reach, Reach, via, Sardinel, Sardinel, via, via, Sardinel, Postetel, via, via, Sardinel, Sardinel, Postlu, Postetel, Paramen, Postetel, Reach, via, via, Sardinel, Sardinel, Postetel, Postlu, via, Sardinel, Paramen, Paramen, via, via, Sardinel, Sardinel, Postlu, Postetel, Reach, Reach, Paramen, Paramen, Paramen, sink, sink, sink, Reach, Reach, Postetel, Postlu, via, Sardinel, Paramen, Paramen, via, via, Sardinel, Sardinel, Postetel, Postlu, Paramen
Raw text data extracted from CAD file:
Language | Spanish |
Drawing Type | Block |
Category | Water Sewage & Electricity Infrastructure |
Additional Screenshots | |
File Type | dwg |
Materials | Concrete, Steel, Other |
Measurement Units | |
Footprint Area | |
Building Features | A/C, Car Parking Lot, Garden / Park |
Tags | autocad, block, chamber, distribution, DWG, environmental, fornecimento de água, kläranlage, l'approvisionnement en eau, pollution, supply, treatment plant, wasserversorgung, water, waters |