Transition Air – Air Ground DWG Block for AutoCAD
AERO TRANSITION – UNDERGROUND HIGH TENSION POLE FRUSTUMCONIC PIRAMIDAL .
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
world class, Max, Of underground systems, Iepe, Electrical electrical projects, plant, Step of, Omegas, basin, For screw, head on, elevation, Mm holes, Of diameter for, Pipeline passage, Flexible, Minimum mts., brand, Baseboard detail, Support welded to the arm of, Drivers, Location of faces of the, post, Detail for connector, Of earth in cane, brand, Detail of the omega, jacket, Ground level, Two windows of mm, decade, In faces, For maneuvers with, Power cables., Lightweight concrete fill in, Second cast after, Pipelines placed, To avoid, Movement during, Installation maneuvers, The power cables., Drill, Mm thread, for, Connector similar to the, Burndy cat., Review thread, after the, galvanized, Plate, Welded the rod, axis of, arms, Line axis, round, hole, Pl of, Holes for, Screw, Cover plate, Hole for, Pl of, Reinforcement jacket, Pl of, elevation, Guard cable arm, Screw mm., Screws, on each side, Welded to the pole in part, Sole of, Top with threaded bore, For cap holder, Cover plate, Pl of, view, Bluff edges, basin, For screw, brand, Detail of the base plate support, Welded to guard wire arm, basin, For screw, brand, Detail of the base plate support, Welded to guard wire arm, Detail of welded plate, Pole pole for support of, Arm of conductors, Hole for, Screw, above, in the middle, low, above, in the middle, low, Ear detail mark, drill, Pl of, See note no., Typical coupling, ear, Tip, Identification mark, cut, Tor. from, Plaid jacket detail, Stabilizer, Stabilizer plate, Welded cover, Pl of, Tor. from, Pl of, Template, concrete, symmetrical, Post shaft, Screws, on each side, plant, Pl of, cover of, Reinforcement pl, Pl of, Steps of, work, Pl of, Driver’s arm, elevation, Holes of, For screws, jacket, Pl of, Pl of, symmetrical, Post shaft, See detail no., Window for maneuvers, Lateral elevation, Max, arms, Considerations for placement of steps:, Steps will be installed starting from the meters on the, Shall be placed separately spaced centimeters, In a sense going up the cane up to centimeters, Down the post crown., The horizontal separation of the steps will not be greater, An arc of centimeters in diameter of the larger reed, For steps the steps are, Additional steps of, Work separated around the placed, Cm below the intersection of each cable flange arm of, Power with it will also be placed omegas to fix, Safety belts cm above the, Detail of the, Pole diameter, Greater mm, Pole diameter, Lower mm, Face no, Step detail, Plate, symmetrical, Post shaft, symmetrical, Post shaft, plant, rule, Pl of, Pl of, High voltage in pyramidal truncated pole, Pl of, of the, Hexagonal spring washer square nut, elevation, Pl of, Fov, Fov, Fov, Pl of, see details, Pl of, Flanges sectioned to facilitate maneuvers with power cables, Blunt edge drill for ground wire outlet, See typical coupling detail, Earth spout, Terminal earth connection, Earth wire from the outside of the pole, See guard cable arm detail, Pl of, See step detail, Awg caliber bare copper wire inside the pole, See detail of stabilizer plate jacket, See details of conduit outputs for power cables, Transverse post trunk side elevation front view, Notes: The support plates are made of steel grade stainless steel. The tubular sections are flanged to support the terminals. They will be of steel, not their stainless steel screws. The bolts nuts must according to specification astm respectively the anchors should be special galvanized according to the standard the weld will adjust the guidelines of the procedure recommended by the aws for the longitudinal welds submerged arc with compatible electrode with metal base penetration minimum of when making the post the Female section should be welded on the outside to penetration. Submerged arc with electrode compatible with metal base of minimum penetration splicing the sections with two hydraulic pistons of each other applying in each piston a force of kn for each of thickness of the female section see list of parts masses in sheet, Splice boundary mark, Of welds to the cane to assure flexible ducts of during the casting of the concrete of filling, For power cables, For fiber optics, Conduit output power fiber cables, Ing. Diego Rodriguez
Raw text data extracted from CAD file:
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
world class, Max, Of underground systems, Iepe, Electrical project electricity, plant, Step of, Omegas, basin, For screw, head on, elevation, Mm holes, Of diameter for, Pipeline passage, Flexible, Minimum mts., brand, Baseboard detail, Support welded to the arm of, Drivers, Location of faces of the, post, Detail for connector, Of earth in cane, brand, Detail of the omega, jacket, Ground level, Two windows of mm, decade, In faces, For maneuvers with, Power cables., Lightweight concrete fill in, Second cast after, Pipelines placed, To avoid, Movement during, Installation maneuvers, The power cables., Drill, Mm thread, for, Connector similar to the, Burndy cat., Review thread, after the, galvanized, Plate, Welded the rod, axis of, arms, Line axis, round, hole, Pl of, Holes for, Screw, Cover plate, Hole for, Pl of, Reinforcement jacket, Pl of, elevation, Guard cable arm, Screw mm., Screws, on each side, Welded to the pole in part, Sole of, Top with threaded bore, For cap holder, Cover plate, Pl of, view, Blunt edges, basin, For screw, brand, Detail of the base plate support, Welded to guard wire arm, basin, For screw, brand, Detail of the base plate support, Welded to guard wire arm, Detail of welded plate, Pole rod for support of, Driver’s arm, Hole for, Screw, above, in the middle, low, above, in the middle, low, Ear detail mark, drill, Pl of, See note no., Typical coupling, ear, Tip, Identification mark, cut, Tor. from, Plaid jacket detail, Stabilizer, Stabilizer plate, Welded cover, Pl of, Tor. from, Pl of, Template, concrete, symmetrical, Post shaft, Screws, on each side, plant, Pl of, cover of, Reinforcement pl, Pl of, Steps of, work, Pl of, Driver’s arm, elevation, Holes of, For screws, jacket, Pl of, Pl of, symmetrical, Post shaft, See detail no., Window for maneuvers, Lateral elevation, Max, arms, Considerations for placement of steps:, Steps will be installed starting from the meters on the, Shall be placed in spaced apart spacing centimeters, In a sense going up the cane up to centimeters, Down the post crown., The horizontal separation of the steps will not be greater, An arc of centimeters in diameters of the larger reed, For steps the steps are, Additionally steps of, Work separated around the placed, Cm below the intersection of each cable flange arm of, Power with it will also be placed omegas to fix, Safety belts cm above the, Detail of the, Pole diameter, Greater mm, Pole diameter, Lower mm, Face no, Step detail, Plate, symmetrical, Post shaft, symmetrical, Post shaft, plant, rule, Pl of, Pl of, High tension in pyramidal truncated pole, Pl of, of the, Hexagonal spring washer square nut, elevation, Pl of, Fov, Fov, Fov, Pl of, see details, Pl of, Flanges sectioned to facilitate maneuvers with power cables, Blunt edge drill for ground wire outlet, See typical coupling detail, Ground spout, Terminal earth connection, Ground wire from outside pole, See detail of guard wire arm, Pl of, See step detail, Awg caliber bare copper wire inside pole, See detail of stabilizer plate jacket, See details of conduit outputs for power cables, Transverse pole trunk side elevation front view, Notes: The support plates are made of steel grade stainless steel. The tubular sections are flanged to support the terminals. They will be of steel, not their stainless steel screws. The bolts nuts must according to specification astm respectively the anchors should be special galvanized according to the standard the weld will adjust the guidelines of the procedures recommended by the aws for the longitudinal welds submerged arc with compatible electrode with metal base penetration minimum of when making the post the Female section should be welded inside out to penetration. Submerged arc with electrode compatible with metal base of minimum penetration splicing the sections with two hydraulic pistons of each other applying in each piston a force of kn for each of thickness of the female section see list of parts masses in sheet, Splice boundary mark, Of welds to the cane to assure flexible ducts of during the casting of the concrete of filling, For power cables, For fiber optics, Conduit output power fiber cables, Ing. Diego Rodriguez
Raw text data extracted from CAD file:
Language | Spanish |
Drawing Type | Block |
Category | Water Sewage & Electricity Infrastructure |
Additional Screenshots | |
File Type | dwg |
Materials | Concrete, Steel, Other |
Measurement Units | |
Footprint Area | |
Building Features | Car Parking Lot |
Tags | air, alta tensão, autocad, beleuchtung, block, détails électriques, detalhes elétrica, DWG, electrical details, elektrische details, ground, groundwater, haute tension, high, high tension, hochspannung, iluminação, kläranlage, l'éclairage, la tour, lighting, Pole, tension, torre, tower, transition, treatment plant, turm, underground |