Fire Protection – DWG Block for AutoCAD

or

Fire Protection

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

Centralarm, Engineering systems security, reviewed, Drawn, do not., Notes, sheet:, draft:, Drawn:, Esc:, review:, Reference planes, date:, approved:, reviewed:, Title of the map:, designed:, contract:, Approve, do not. flat:, review, date, Rev., Esc:, plant, Attached to the ministry of oil energy, AC. Electric power from venezuela, Of ups batteries, Room telecommunications room, Building south operations center, to. Brackish, Distribution outside area, Storage system, to. Brackish, and. Sarcos, Indicated, Define in, Nipple, Radial nozzle, Ceiling plate, Nozzle detail, wall, Mineral wool, Fire barriers fs one by hilti, cables, Cable gland seal, Abrasive, Define in, support, Abrasive, Bolts, wall, beam, support, sign, sign, nozzle, Lbs cylinder with lbs, Isometry, Isometria system room battery ups, plant, Procedures, green area, telephone exchange, Batteries u.p.s., Logistics, nozzle, Lbs cylinder with lbs, Remove the area if activated, do not enter until it is ventilated., Room protected with system of prohibited unauthorized access, C.c.e., Thw, Kidde, Scorpio, cylinder, Vac, Abortion, discharge, alarm, fault, zone, Panel extinction, Existing loop s, Stop air conditioning unit, Vac towards ups, Alarm download agent., Conventional photoelectric smoke detector, Laser smoke detector, Tie extension, Pcm, Smoke extractor, Manual activation station, Extractor switch, Emergency ventilator board, Typical scheme of the system, plant, discharge, alarm, fault, Tie extension, Cabinet monitoring module, Abortion station, Manual activation station, Cylinder pressure supervisor, Alarm monitoring module, Fault monitoring module, Local alarm, Electric actuator, Extractor control relay, Releasing, Panel connections scorpio extinction, It is the contractor’s responsibility to check the dimensions in the enclosures to protect. Perform the flow calculations by means of the manufacturer of the equipment with approval ul., description, symbol, Extractor switch, Emergency fan board, Cabinet with monitoring modules, Conventional photoelectric smoke detector, Multitone siren with strobe light, Manual abortion extinguisher station, Extinction panel, Abortion button, Stop, start, You, Ctr, Tdr, Ctr, M: tdr fan motor: ctr timer: lv contactor: green light ri: relay vdc, fuse, fuse, Control panel emergency fan, Of ups batteries, Room telecommunications room, Building south operations center, to. Brackish, Inner area, System performance control, to. Brackish, and. Sarcos, Indicated, Extractor control box, C.c.e., Electric control, Electrical conduit detection system, C.c.e., Thw, Rfl, Rfl, Rfl, Rfl, Thw, Tf thw, Towards a, Procedures, green area, telephone exchange, Batteries u.p.s., Logistics

Raw text data extracted from CAD file:

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

Centralarm, Engineering systems security, reviewed, Drawn, do not., Notes, sheet:, draft:, Drawn:, Esc:, review:, Reference planes, date:, approved:, reviewed:, Title of the map:, designed:, contract:, Approve, do not. flat:, review, date, Rev., Esc:, plant, Attached to the ministry of oil energy, AC. Electric power from venezuela, Of ups batteries, Room telecommunications room, Building south operations center, to. Brackish, Distribution outside area, Storage system, to. Brackish, and. Sarcos, Indicated, Define in, Nipple, Radial nozzle, Ceiling plate, Nozzle detail, wall, Mineral wool, Fire barriers fs one by hilti, cables, Cable gland seal, Abrasive, Define in, support, Abrasive, Bolts, wall, beam, support, sign, sign, nozzle, Lbs cylinder with lbs, Isometry, Isometria system room battery ups, plant, Procedures, green area, telephone exchange, Batteries u.p.s., Logistics, nozzle, Lbs cylinder with lbs, Remove the area if activated, do not enter until it is ventilated., Room protected with system of prohibited unauthorized access, C.c.e., Thw, Kidde, Scorpio, cylinder, Vac, Abortion, discharge, alarm, fault, zone, Panel extinction, Existing loop s, Stop air conditioning unit, Vac towards ups, Alarm download agent., Conventional photoelectric smoke detector, Laser smoke detector, Tie extension, Pcm, Smoke extractor, Manual activation station, Extractor switch, Emergency ventilator board, Typical scheme of the system, plant, discharge, alarm, fault, Tie extension, Cabinet monitoring module, Abortion station, Manual activation station, Cylinder pressure supervisor, Alarm monitoring module, Fault monitoring module, Local alarm, Electric actuator, Extractor control relay, Releasing, Panel connections scorpio extinction, It is the contractor’s responsibility to check the dimensions in the enclosures to protect. Perform the flow calculations by means of the manufacturer of the equipment with approval ul., description, symbol, Extractor switch, Emergency fan board, Cabinet with monitoring modules, Conventional photoelectric smoke detector, Multitone siren with strobe light, Abortion manual extinguishing station, Extinction panel, Abortion button, Stop, start, You, Ctr, Tdr, Ctr, M: tdr fan motor: ctr timer: lv contactor: green light ri: relay vdc, fuse, fuse, Control panel emergency fan, Of ups batteries, Room telecommunications room, Building south operations center, to. Brackish, Inner area, System performance control, to. Brackish, and. Sarcos, Indicated, Extractor control box, C.c.e., Electric control, Electrical conduit detection system, C.c.e., Thw, Rfl, Rfl, Rfl, Rfl, Thw, Tf thw, Towards a, Procedures, green area, telephone exchange, Batteries u.p.s., Logistics

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Block
Category
Additional Screenshots
File Type dwg
Materials Other
Measurement Units
Footprint Area
Building Features Car Parking Lot
Tags , , , , , , , , , , , , , , , , ,
or

Share Your Valuable Opinions

Cart (0)

  • Your cart is empty.