Onslaught Media Tension DWG Detail for AutoCAD
Measurement standard roof – Detail rush Media Tension – Especiicacion of materials and euipos by the applicant.
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
Medium voltage stress, Note: the cabinet with the tcs can be placed the output of the transformer., Note: The cabinet with the tcs can be placed next to the meter., To the measuring equipment, Ground floor property boundary on the wall, side view, Load switch, To the measuring equipment, Sheet cabinet, Box boot waters, Measurements in meters, unscaled, Cfe, Equipment specification equipment charge of the applicant: transformer according to the need of the service. Base transformer support. Mesh type cyclone according to the need of the service. Iron structure according to fuse specifications according to the need of the service. Apartarrayo according to the need of the service. Mufa for conduit conduit according to the diameter of the pipe. Conduit tube thick wall of designation metric according to the caliber of the conductors. Copper cable thw according the load install. For meter with test board. Earth electrode of minimum diameter mm for a maximum resistance of according to the article of seat. Earth electrode connector. Shell conduit dlg metric designation to protect the ground wire. Conduit tube thick wall of metric designation for protection of control cable. Metal cabinet of lamina caliber of with paint to house tube conduit of thick wall for connection of mt. Conductor downspout minimum size according to item of equipment installed equipment by cfe charge: multi-function plug-in meter for padlock type plastic seal. Current transformers. Notes the configuration design of the substation is the responsibility of complying with the opinion of a verification unit of electrical installations approved by the secretary of energy. The physical ground of the meter must not be the same as that of the substation for protection of the meter. The downlink conductor minimum size according to the art when the project includes two transformers should be consulted with the zone measurement department. The tubing that goes from the base of the meter to the meter must not carry records. The distance must not be greater. The terminals of the transformer must be taped. The meter must be located at the limit of the property. The base of the meter can be embedded. The procedures for the supply of electric energy must be in accordance with the specification of all the attention of applicants of electric energy service applicants. Failure to comply with this specification will cause cfe not to provide the supply.
Raw text data extracted from CAD file:
Language | Spanish |
Drawing Type | Detail |
Category | Mechanical, Electrical & Plumbing (MEP) |
Additional Screenshots | |
File Type | dwg |
Materials | Plastic |
Measurement Units | |
Footprint Area | |
Building Features | Car Parking Lot |
Tags | autocad, DETAIL, DWG, einrichtungen, electricity, facilities, gas, gesundheit, l'approvisionnement en eau, la sant, le gaz, machine room, maquinas, maschinenrauminstallations, materials, measurement, media, provision, roof, rush, standard, tension, wasser bestimmung, water |