ADVERTISEMENT

ADVERTISEMENT

Water Sewer Drain DWG Block for AutoCAD

Water Sewer Drain – Plant – Interconnection of electrical systems

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

N.m., date, approved:, Rev., Approve, date:, reviewed:, Drawn:, designed:, Phone, av. Nicolas arriola, Bellavista consortium, flat:, Project nº:, scale:, drawing:, title:, draft:, San martin al sein, Interconnection of the electrical system, date:, sheet:, revised:, regional government, San Martin, Phone, saint, av. From the north park, review:, S.a. Construction engineer, General contractor s.a.c., Technology development, date, approved:, Rev., Approve, date:, reviewed:, Drawn:, designed:, Phone, av. Nicolas arriola, Bellavista consortium, archive:, Project nº:, scale:, Plan nº:, title:, draft:, San martin al sein, Interconnection of the electrical system, Rev:, Format:, sheet:, Phone, saint, av. From the north park, date, approved:, Rev., Approve, date:, reviewed:, Drawn:, designed:, Phone, av. Nicolas arriola, Bellavista consortium, archive:, Project nº:, scale:, Plan nº:, title:, draft:, San martin al sein, Interconnection of the electrical system, Rev:, Format:, sheet:, regional government, San Martin, Phone, saint, av. From the north park, General contractor s.a.c., Technology development, S.a. Construction engineer, General contractor s.a.c., Technology development, Issued for approval, D.b., E.g., D.b.p., J.p., fa., General arrangement of bases plant channels, Amplification in kv s.e. beautiful view, elevation, Scale, scale, Elevation, elevation, scale, Elevation, Scale, Tank for, Petroleum, Future installations, Perimeter wall, Projected, Thermal power station ii, Drainage channel, tank, existing, of control, living room, new. Access track, Drainage channel, Pool, stand, Existing channel, Shilcayo, Projected, new. Access track, tank, Drainage channel, door, Relocated, compensation, Jiron malecon, Cell of, mailbox, Of s.e. beautiful view, existing, L.t. Kv, HE. Moyobamba, L.t. Kv, Notes:, Bases of equipment of, Current transformer, description, base, Cant, Kv patio, Perimeter wall, Access track, Reticulated mastic, For guard wire, Mvar reactor, Tripolar power, Switch of, Current transformer, Bar disconnector, description, portico, lighting rod, base, Cant, Reactor equipment bases, axis of, Kv equipment, plant, scale, Electrowelded, Siege, See arrangement of equipment reactor general plant in plane location defined by perimeter perimetric wall equal to existing, Det, Det., Det., Det., Det., Det., Det., Det., see note, Issued for approval, D.b., E.g., D.b.p., J.p., fa., General arrangement of bases plant channels, Amplification in kv s.e. Tarapoto, D.b., E.g., date, approved:, Rev., Approve, date:, reviewed:, Drawn:, designed:, Phone, av. Nicolas arriola, Bellavista consortium, archive:, Project nº:, scale:, Plan nº:, title:, draft:, San martin al sein, Interconnection of the electrical system, Rev:, Format:, sheet:, Phone, saint, av. From the north park, date, approved:, Rev., Approve, date:, reviewed:, Drawn:, designed:, Phone, av. Nicolas arriola, Bellavista consortium, archive:, Project nº:, scale:, Plan nº:, title:, draft:, San martin al sein, Interconnection of the electrical system, Rev:, Format:, sheet:, regional government, San Martin, Phone, saint, av. From the north park, General contractor s.a.c., Technology development, S.a. Construction engineer, General contractor s.a.c., Technology development, Var, Filling selected material, scale, section, scale, section, scale, section, Filling selected material, existing, Projected, existing, Projected, existing, Projected, existing, gravel, Filling selected material, note:, See general notes in plan, legend:, Compacted clay, Var, Compacted clay, Var, Compacted clay, scale, section, Filling selected material, Var, Compacted clay, see note, gravel, see note, gravel, Compacted clay, Completely remove the layer of organic soil before, Proceed with the filling., Issued for approval, D.b., E.g., D.b.p., J.p., fa., Indicated, Sections, Amplification in kv s.e. Tarapoto, Min., Min., date, approved:, Rev., Approve, date:, reviewed:, Drawn:, designed:, Phone, av. Nicolas arriola, Bellavista consortium, archive:, Project nº:, scale:, Plan nº:, title:, draft:, San martin al sein, Interconnection of the electrical system, Rev:, Format:, sheet:, Phone, saint, av. From the north park, date, approved:, Rev., Approve, date:, reviewed:, Drawn:, designed:, Phone, av. Nicolas arriola, Bellavista consortium, archive:, Project nº:, scale:, Plan nº:, title:, draft:, San martin al sein, Interconnection of the electrical system, Rev:, Format:, sheet:, regional government, San Martin, Phone, saint, av. From the north park, General contractor s.a.c., Technology development, S.a. Construction engineer, General contractor s.a.c., Technology development, model, Pressure relief valve, Tel., C.n.p.j, Ring, Made in brazil, serial, Det., typical, Notes:

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Block
Category
Additional Screenshots








File Type dwg
Materials
Measurement Units
Footprint Area
Building Features Pool, Deck / Patio, Car Parking Lot, Garden / Park
Tags , , , , , , , , , ,

ADVERTISEMENT

CAD Drawings

Leave a Reply

ADVERTISEMENT